We are proud to announce the successful completion of Stacy Witbeck’s portion of the Silver Lake Reservoir Complex Storage Replacement Project in Los Angeles. This milestone marks a key step in the construction of the Los Angeles Department of Water and Power’s new headworks facility, which will play a critical role in providing safe drinking water for the residents of Los Angeles.
The vaults were backfilled and shoring completely removed. This work led to an additional work package for the Flow Control Station. Now, the Department of Water and Power has started the process of bringing the facility online.
Congratulations to the entire team on their hard work on delivering this essential project.