Stacy Witbeck https://swhhsr.com/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This was a design-build project for a new 1.6-mile streetcar system connecting downtown Dallas to the Oak Cliff neighborhood. The work included crossing the 4,700-ft., 101-year-old historic Houston Viaduct bridge structure with a new track, installation of train and traffic signals, four stops, one traction power substation, underground utilities, bridge restoration, and third-party utility coordination. 

This was the first project in the United States to use wireless traction power using an onboard stored energy system.

Quick Facts

Location

Dallas, TX

Project Type

Bridges and Highways, Streetcar

Delivery Method

Design-Build

Date Completed

2014

Project Owner

Dallas Area Rapid Transit (DART)

Subsidiary Involvement

Modern Railway Systems

Region

Central

/

"Stacy Witbeck provided valuable assistance in meeting tight schedules and managing long billing cycles while supporting our growth. Their knowledgeable team worked in partnership with us to overcome technical project obstacles."

Senior Vice President of Operations, Subcontractor